MD IMAM UDDIN
Loading baseline programme…
PLANNING
Planning Engineer · Abu Dhabi, UAE
👋 Hello, I'm

MD IMAMUDDIN

>_Planning Engineer

Keeping mega-projects on the critical path. 6+ years in project controls — DCMA 14-point audits, Earned Value and forensic EOT evaluation across mega-housing, ADNOC EPC and refinery turnarounds in the UAE, Kuwait and India.

0+Years in planning
0Villas overseen
0Wells tie-in (ADNOC)
0Countries
Primavera P6
Power BI
S-Curves · EVM
DCMA 14-Pt
TIA · EOT
Excel
Md Imam Uddin, Planning Engineer
Md Imam UddinPlanning Engineer · Abu Dhabi
P6 ✓
SCROLL

Clients & programmes I've planned for

ADNOC OnshoreADHA Housing AuthorityEQUATE PetrochemicalIOCL RefineriesReliance Jamnagar
Core capabilities

Project controls, end to end.

Planning experience from both sides of the table — as the supervision consultant reviewing programmes, and as the EPC contractor building them.

Master_Programme_L3.xer Primavera P6
ACTIVITY
Q1Q2Q3Q4Q1Q2
1.0 Engineering
Design Approval
2.0 Procurement
Long-Lead Items
3.0 Construction
Civil & Structure
MEP Installation
T&C / Handover
ActivityCritical pathBaseline
SPI0.96
CPI1.02
DCMA14/14
01

Schedule Architecture & DCMA Audits

Building and auditing Level 1–4 master schedules — open ends, negative float, hard constraints and unauthorised logic changes.

Primavera P6DCMA 14-PointWBS Design
02

Delay Analysis & EOT Evaluation

Separating excusable, non-excusable and concurrent delay; validating acceleration and recovery programmes.

Time Impact AnalysisWindows AnalysisFloat Trends
03

Earned Value & BI Dashboards

Forecasting completion and cost variance from cost/resource-loaded schedules, S-curves and executive dashboards.

SPI / CPI / EACPower BITableau
04

Progress Measurement (PMS)

Weightage and milestone-based PMS frameworks that verify contractor progress claims against site inspection records.

S-CurvesHistogramsLook-Aheads
05

Shutdown & Turnaround Planning

Detailed sequencing and multi-discipline coordination (mechanical, electrical, instrumentation) for high-pressure plant turnarounds.

Oil & GasRefineriesCritical Path
06

Cost Estimation & QS

Drawing take-offs, Bill of Materials, cash-flow validation, and RA / final billing verification.

RIB CostXPlanSwiftBilling & BOM
TOOLKIT Primavera P6Power BITableauMS ExcelMS ProjectRIB CostXPlanSwift
Reporting methodology

From P6 data to decisions.

Pick a project type to see how I turn schedule and Earned Value data into the view a client or project director actually needs.

* Illustrative sample data (NDA-safe)
Baseline plannedActual progressRecovery forecast
100%75%50%25%0% StartPhase 2Data DateFinish
SPI · Schedule
0.96
CPI · Cost
1.02
DCMA health
94%
Critical float
−4d
Consultant action → Flagged −4d slippage on MEP infrastructure interfaces; audited the contractor's recovery shift plan using Windows Analysis.
Selected work

Key developments & industrial assets.

Representative capital projects across government infrastructure, upstream oil & gas and refining.

Infrastructure · Housing📍 Abu Dhabi, UAE
0villas + city-scale infrastructure

Al Sharayef Emirati Housing Development

Client: Abu Dhabi Housing Authority (ADHA) · West Baniyas

Planning lead on the supervision consultant side. DCMA 14-point checks, progress verification, EOT evaluation using TIA and Windows Analysis, and Power BI progress reporting for the client.

DCMA 14-PointEOT AnalysisPower BI DashboardConsultant Side
Upstream Oil & Gas📍 Abu Dhabi
24wells + 33 kV OHL

ADNOC EPC Tie-In & 33 kV Overhead Line

ADNOC via Al Nasr · Shah–Qusahwira–Mender

EPC schedules for Phase 2 (20 wells), Phase 3 (4 wells) and OHL works. Secured baseline approval; delivered PMS, risk registers and payment S-curves.

Baseline ApprovalPMS & Risk
Government Buildings📍 Abu Dhabi
EVMSPI · CPI · EAC

Government Buildings Programme

Government clients · Abu Dhabi

Reviewing baseline, revised and recovery programmes, cost/resource-loaded S-curves, Earned Value tracking and schedule comment close-out.

Recovery SchedulesClient Reporting
Petrochemical Shutdown📍 Kuwait
L4resource-loaded P6

Ethylene Unit-2 (EU-2) Major Shutdown

EQUATE Petrochemical Co.

Level 4 resource-loaded schedules for a time-critical turnaround, with daily planned-vs-actual tracking across mechanical, electrical and instrumentation.

Multi-DisciplineTurnaround
Refinery Maintenance📍 Assam & Bihar, India
2refineries · multi-year

IOCL Refineries — Maintenance & Turnarounds

Indian Oil Corp. · Bongaigaon & Barauni

P6 turnaround schedules, manpower forecast-vs-actual histograms, daily bottleneck resolution and management close-out reports.

Manpower HistogramsClose-Out
Refinery Complex📍 Jamnagar, India
RILworld-scale refinery

Reliance Industries — Jamnagar Works

Reliance Industries via Pressure Part Eng.

Project planning, schedule tracking, BOM coordination and progress monitoring inside one of the world's largest refining complexes.

Heavy IndustrialMaterial Tracking
Work samples

How I report progress.

Samples showing how I build schedules and present Earned Value, progress and resource data. All figures and percentages are hidden for confidentiality. Click any chart to view it full size.

Career programme

My career, as a Gantt chart.

Six years of continuous delivery — from refinery site supervision in India to consultant-side planning on Abu Dhabi's largest housing programme. Tap a bar for details.

ROLE
202120222023202420252026
Planner / SupervisorRIL Jamnagar · IOCL Barauni
Oct 2020 – Dec 2022
Junior Planner (Shutdown)STS · EQUATE, Kuwait
Planning EngineerAfnur Ali · IOCL Bongaigaon
Apr 2023 – Nov 2024
Planning Engineer (EPC)DRA Infracon · ADNOC
Nov 24 – Sep 25
Planning Engineer (Consultant)Pioneer Engineering · Abu Dhabi
Oct 2025 – Now
Oct 2025 – Present Current

Planning Engineer (Consultant Side)

Pioneer Engineering Consultancy LLC — Abu Dhabi, UAE
  • Reviewing baseline, updated and recovery Primavera P6 schedules for government housing and building projects in Abu Dhabi.
  • DCMA 14-point checks, Windows and Time Impact EOT evaluations, and EVM / Power BI executive reporting.
Nov 2024 – Sep 2025

Planning Engineer (EPC)

DRA (Dineshchandra R. Agrawal Infracon) — Abu Dhabi
  • Managed ADNOC Shah–Qusahwira–Mender (24 wells) tie-in and 33 kV OHL schedules from baseline approval through execution.
  • Delivered WBS, PMS, physical/payment S-curves, risk registers and Earned Value reports.
Apr 2023 – Nov 2024

Planning Engineer

M/S Afnur Ali Pvt Ltd (IOCL Bongaigaon) — Assam, India
  • Led P6 planning, manpower histograms, daily review meetings and close-out documentation for refinery turnarounds.
Jan 2023 – Mar 2023

Junior Planner (Shutdown)

STS (Special Technical Services) — EQUATE, Kuwait
  • Built Level 4 resource-loaded shutdown schedules for Ethylene Unit-2 and coordinated mechanical / E&I progress tracking.
Oct 2020 – Dec 2022

Planning Engineer / Asst. Planner / Supervisor

Pressure Part Eng. (RIL Jamnagar) · KKS & NACPL (IOCL Barauni)
  • Progressed from site supervision to planning engineering across major Indian refining hubs — foundations in P6, BOM and progress reporting.
Credentials

Education & certification

B.Tech — Civil EngineeringDr. A.P.J. Abdul Kalam Technical University (AKTU), India
Oracle Primavera P6 Certified ProfessionalEnterprise project portfolio management & delay controls
PMI badge
PMI Badge — Generative AI Overview for Project ManagersProject Management Institute (PMI)
Languages
English · FluentHindi · NativeUrdu · Fluent
Let's talk

Let's connect.

Happy to connect with fellow planners and project controls professionals on scheduling, delay analysis and project reporting.

Phone / WhatsApp+971 50 477 2066
Current baseAbu Dhabi, UAE